Work Order Information
Auto-generated
PCS
BOM base quantity will be multiplied by this value
Operations (from BOM)
Select a BOM to automatically load operations
# Operation Name Work Center Planned Hours Description Action
Required Materials (from BOM)
Select a BOM and enter planned quantity to calculate material requirements
Item Code Item Name Required Qty Available Stock UOM Status
Summary
Status
PLANNED
Product
-
Planned Qty
-
Operations
0
Total Hours
0.00 hrs
Materials
0 items